City Projects 

3RDSTU (3rd Street Utility Rehabilitation)

City Project Manager: William Winkler, P.E.

Design Consultant: WWC Engineering

Plans: 3rd Street Utility Rehabilitation

Public notice letter: 3rd Street

Contractor: TBD

Project Location: 3rd Street, Palmer Street to Superior Court

Project Description: The City of Laramie is scheduled to complete a multi-phase water system rehabilitation project in the 3rd Street corridor, from Palmer Street to Superior Court.  As part of the improvements the City will be installing over 11,000 feet of water main, 27 fire hydrants, 86 valves, and nearly 130 water services.

Scheduled Completion Date: Fall 2022


GFSR4S (4th Street Reconstruction)

City Project Manager: William Winkler, P.E.

Design Consultant: City of Laramie

Plans: 4th Street Reconstruction

Public notice letter: 4th Street

Contractor: TBD

Project Location: 4th Street, Flint St to Harney St

Project Description: The City will be remediating the existing base and subbase and providing ADA upgrades as needed. Expected roadway closures include the entirety of 4th street from Harney to Flint to include the intersection of Gibbon Street and Flint Street.

Scheduled Completion Date: Fall 2020


GFTS22 (22nd St & Reynolds St Traffic Control)

City Project Manager: Eric Milliken, P.E.

Design Consultant: DOWL

Plans: 22nd St & Reynolds St Construction Plans

Public Notice Letter: Construction Notification

Contractor: Simon

Project Location: 22nd St & Reynolds St Intersection

Project Description: Recommendations from multiple traffic studies conducted by the City and local developers state that a signal should be installed at this intersection. The project will also include upgraded ADA facilities and crosswalks on all four corners of the intersection. 

Scheduled Completion Date: Fall 2020


RIVERSIDE DRIVE ASPHALT REPLACEMENT

City Project Manager: Mark Hazelett

Design Consultant: City of Laramie

Plans: Riverside Drive

Public notice letter: Riverside Drive

Contractor: TBD

Project Location: Riverside Drive, Adams to Colorado

Project Description: The City of Laramie Is scheduled to replace asphalt along Riverside Drive, Adams Street to Colorado Avenue. Access will be limited along Riverside Dr. Closures include Sections of Riverside with planned traffic control to assist with property access.

Scheduled Completion Date: Fall 2020


SSPAD (Sanitary Sewer Priority Alley Replacement Design)

City Project Manager: Mark Hazelett

Design Consultant: Dowl

Plans:

Public notice letter: Alley Rehabilitation

Contractor: Six Points

Project Location: 8th/9th Steele - Russell, Hillside/Holiday northeast from Corthell 

Project Description:

Scheduled Completion Date: Fall 2020


STORM WATER FILTRATION

City Project Manager: Mark Hazelett

Design Consultant: City of Laramie

Public notice letter: Storm Water Filtration

Contractor: Frog Creek

Project Location: Downtown Laramie

Project Description: The City of Laramie has purchased two storm water filtration Gutter Bins TM to start a test program to increase environmental stewardship in the Laramie area.

Scheduled Completion Date: June 2020


STP09S (9th Street Rehabilitation)

City Project Manager: William Winkler, P.E.

Design Consultant: City of Laramie

Public notice letter: 9th Street

Contractor: TBD

Project Location: 9th Street, Sanders-Palmer Alley to Arnold Street

Project Description: The City of Laramie is scheduled to complete planned improvements, remediating the existing base and subbase and providing ADA upgrades as needed.

 Scheduled Completion Date: Fall 2020


WTL10F (10th St & Flint St Water Main Replacement)

City Project Manager: Eric Milliken, P.E.

Design Consultant: City of Laramie

Plans: 10th St & Flint St Water Main Replacement Final Plan Set

Public Notice Letter:

Contractor: TBD

Project Location: 10th St & Bradley St; 14th St & Flint St

Project Description: Replace the 4” water main in 10th St between Bradley St and Gibbon St, and replace the 4” water main in Flint St between 11th St and 14th St.

Scheduled Completion Date: Fall 2020


WTLGSP (Grafton Street Rehabilitation)

City Project Manager: William Winkler, P.E.

Design Consultant: City of Laramie

Plans: Grafton Street Priority Replacement

Public Notice Letter: Grafton Street

Contractor: TBD

Project Location: Grafton Street, 13th to 15th

Project Description: Due to numerous utility breaks the water line in Grafton street, between 13th Street and 15th Street, is scheduled to be replaced. As part of this project the City intends to mill and pave the existing roadway and perform sidewalk, curb and gutter, and ADA upgrades. The project limits are outlined in the attached exhibit

Scheduled Completion Date: Fall 2020